Research Article
Retrofitting Transportation Network Using a Fuzzy Random Multiobjective Bilevel Model to Hedge against Seismic Risk
Table 5
Cost data of retrofit and reconstruction.
| Item | Cost (¥) |
| Increased variable retrofit costs for permanent link by basic rank (i.e., rank 1) | 16732 | Variable retrofit costs for temporary link by basic rank (i.e., rank 1) | 30528 | Increased fixed retrofit costs for permanent link | 14525 | Fixed retrofit costs for temporary link | 28637 | Increased variable reconstruction cost for permanent link by basic rank (i.e., rank 1) | 107052 | Variable reconstruction cost for temporary link by basic rank (i.e., rank 1) | 98063 | Increased fixed reconstruction cost for permanent link | 69894 | Fixed reconstruction cost for temporary link | 50183 |
|
|