Research Article

Beneficial and Detrimental Effects of Soil-Structure Interaction on Probabilistic Seismic Hazard and Risk of Nuclear Power Plant

Figure 1

Conceptual image of the five key steps in a PSHA: (a) Step 1: identify the earthquake sources; (b) Step 2: define the distribution of the earthquake magnitude; (c) Step 3: define the distribution of earthquake distances; (d) Step 4: set the ground motion prediction model; (e) Step 5: annual rate of exceeding the seismic hazard intensity as determined by combining steps 1–4.
(a)
(b)
(c)
(d)
(e)