Research Article

Research on Inpit Dumping Height during Tracing Mining Period between Two Adjacent Surface Coal Mines

Table 6

Transportation cost of stripping spoil over elevation 1130 in Haerwusu coal mine with elevation 1130 covered.

ElevationEngineering quantity (m3 × 106)Distance (m)Transportation unit price (yuan/m4)Transportation cost (million yuan)

12050.7451150.00259.41
11902.0149700.002525.03
11753.8251240.002548.90
11608.7251700.0025112.75
114516.0852550.0025211.25
113022.9447000.0025269.50
111524.0645200.0025271.82
110029.4139500.0025290.46
Total1239.12