Research Article

Research on Inpit Dumping Height during Tracing Mining Period between Two Adjacent Surface Coal Mines

Table 7

Secondary stripping amount and the cost with 1160 elevation dumped of Heidaigou surface coal mine.

YearSecondary stripping tonnage (m3 × 106)Stripping unit price (yuan)Secondary striping cost (million yuan)

20158.8612106.31
201612.8812154.51
201712.1312145.54
Total33.8612406.36