Research Article

Seismic Performance Evaluation of Footing-to-Circular RC Pier Connection Reinforced by High-Manganese Steel Bars (HMSBs)

Figure 19

F-HMSB at the final stage (7.91%): (a) reinforcement stress distributions; (b) concrete stress distributions; and (c) concrete cracks.
(a)
(b)
(c)