LOD | Modeling level of the BIM model by LOD |
|
LOD 100 | Mass at the level of planning work |
Shape, volume, and type of the building |
Determination of the area, height, volume, position, incense, etc., of the entire building |
LOD 200 | Planning step that concept is embodied |
Shape, space program, space planning, and spatial relationship definition |
Decision of general architecture general system |
Planning of approximate floor area, coverage ratio, and floor area ratio, number of floors, floor height, main structure, envelope structure, and equipment system |
LOD 300 | LOD 200 steps to determine the outline of the concrete contents |
Determination of building systems, including detailed installation elements |
Modeling of all architectural elements |
LOD 400 | Modeling steps for actual construction |
Model the size, shape, quantity, etc., of all determined systems |
Model all the elements related to construction, fabrication, and assembly, including details, members, structures, equipment, piping, and wiring |
LOD 500 | The LOD 500 model is the same as the completion model (the modeling data are the same as the actual building) |
Maintenance and overall operation of the building |
|