Research Article
Crack Risk Evaluation of Submerged Concrete Tunnel during Hardening Phase
Figure 6
Calculated temperature developments of SV40 concrete: (a) temperature contour (48 h after casting); (b) maximum temperature in the structure and temperature developments in the inner and outer walls.
(a) |
(b) |