Research Article

Crack Risk Evaluation of Submerged Concrete Tunnel during Hardening Phase

Figure 6

Calculated temperature developments of SV40 concrete: (a) temperature contour (48 h after casting); (b) maximum temperature in the structure and temperature developments in the inner and outer walls.
(a)
(b)