Research Article

Crack Risk Evaluation of Submerged Concrete Tunnel during Hardening Phase

Table 9

Calculated stress/strength ratios at inner and outer walls at 14 days.

ConcreteOuter wallMiddle wallTensile strengthσt/ft outer wallσt/ft inner wall
σtensile, maxσtensile, max

SV 403.914.403.791.041.18
40% FA2.692.993.190.860.96
60% FA2.142.382.910.740.82
60% FA-11°C1.491.662.860.520.58
40% BFS3.353.713.740.901.01
60% BFS3.193.603.201.001.13