Research Article

BIM Use by Architecture, Engineering, and Construction (AEC) Industry in Educational Facility Projects

Table 13

Comparison of current findings and previous research: benefits of BIM use.

Project phaseBIM benefitsCurrent findings: BIM use on educational buildingsPrevious research: BIM use on general type of the buildings

Design phaseEvaluates the impact of different design solutionsBynum et al. [57]
Allows more time to be spent on design than on contract documentationCefrio [9], Korman and Lu [46]
Lowers risk and better predicts outcomes due to discovery of errors, omissions and conflicts prior to constructionU.S. General Service Administration (GSA) [43]
Enables automation of documentation (better accuracy and accounts for adjustments and changes automatically)Bynum et al.[57]
Enables faster reviews for approvals and permits

Construction phaseReduces RFI’s, change orders, claims, and conflictsAzhar [39], Ahn et al. [7], Cao et al. [44], Porwal and Hewage [59], Kraling and Dunbar [60]
Reduces construction and production costsAhn et al. [7], Hamdi and Leite [45], Dodge Data and Analytics [47]
Reduces project delivery timeAhn et al. [7], Hamdi and Leite [45], Dodge Data and Analytics, [47]
Facilitates modular construction
Increase prefabricationAhn et al. [7], Eastman et al. [8]
Reduces on-site waste and materials use
Improves construction safetyAhn et al. [7], Ganbat et al. [51]

Both design and construction phasesIncreases client engagement and provides clearer understanding of 3D visualizationsMcGraw Hill Construction [42], Ganbat et al. [51], Arayici et al. [63], Azhar [39]
Increases productivity and efficiencyCefrio [9], Chelson [53], Poirier et al. [54], Barlish and Sullivan [55], Nath et al. [56]
Encourages consideration for sustainable building systems that conserve energyBynum et al. [57]
Serves as a new marketing tool for firmsAhn et al. [7], Bernstein [61]
Encourages use of other technologies (GIS, unity, etc.)

Both construction and O&M phasesProvides more accurate as-built deliverables

All project phasesImproves collaboration and communication between disciplines due to more reliable and direct data exchange from a single resource of informationBynum et al. [57], Eastman et al. [8]
Increases project profitability
Allow for long term data assessment