Research Article

A Method for Determining the Capacity of an Exclusive Left Lane with a Permitted Phase under Nonstrict Priority

Table 1

Description of field sites.

IntersectionApproachCycle length (seconds)Number of surveyed cyclesExtension distance (meters)Maximum volume of a left-turn group (pcu)

Feiyue rd.-Dongfeng str.E.15520104
W.15520155
Heping rd.-Haoyue str.N.14052196
S.14052218
W.14052237
E.14052278
Jianshe str.-Bei’an rd.E.13030165
W.13030165
Tongzhi str.-Chaoyang rd.W.13330165
E.13330166
Tongzhi str.-Zhonghua rd.W.13330196
E.13330197
Tongzhi str.-Xi’an rd.S.17520369
Tongzhi str.-Ziyou rd.N.18730196
S.18730207
Zhuhai rd.-Huizhan str.N.10535155
E.10535176
S.10535176
W.10535207