| PJT no. | PJT name (city/country) | Total area (m2) | Irregular-shaped segments (m2) | Irregular-shaped segment material | Number of members | Fabrication method | Interior/exterior | Member size | Work type | Construction Period | Software |
| P1 | GT tower (Seoul/Korea) | 54,583 | 19,000 | AL. BAR glass | 22,000 EA 12,500 EA | CNC machine | Exterior | 1,400/1,450 mm × 4,500/6,000/7,000 mm 1,400/1,450 mm × 550/1,100 mm | Curtain wall | 12 months | CATIA | P2 | Tri bowl (Incheon/Korea) | 2,893 | 3,012 | AL. panel | 2,308 EA | CNC machine | Exterior | 1,600 mm × 800 mm | Exterior finish | 8 months | CATIA, Rhino | P3 | DDP (Seoul/Korea) | 83,024 | 33,228 | AL. panel | 45,133 EA | CNC machine and MDSF | Exterior | 1,600 mm × 1,200 mm | Exterior finish | 14 months | CATIA, Rhino, TEKLA | P4 | Ecorium (Seocheon/Korea) | 33,091 | 9,628 | Glass | 32,093 EA | CNC machine | Exterior | 540 mm × 540 mm | Steel curtain wall | 24 months | CATIA | P5 | Theme Pavilion of Yeosu EXPO (Yeosu/Korea) | 7,414 | | GFRP | 98 EA | CNC machine and MDSF | Exterior | | Exterior finish | 20 months | CATIA | P6 | Lotte World tower Podium (Seoul/Korea) | 328,351 | 8,181 | NT panel AL. BAR | 17,934 EA 11,791 EA | CNC machine | Interior | 1000 mm × 200 mm | Interior finish | 10 months | CATIA | P7 | The Arc (Daegu/Korea) | 5,963 | 1,991 | ETFE | 336 EA | CNC machine | Exterior | 3,000 mm × 2,500 mm | Steel exterior finish | 5 months | CATIA | P8 | KEB HANA Bank (Seoul/Korea) | 16,287 | 3450 | UHPC | 256 EA | CNC machine and mold | Exterior | 2,000 mm × 4,200/4,400/6,200 mm | Exterior finish | 12 months | CATIA | P9 | Korea National Maritime Museum (Busan/Korea) | 25,803 | | | | CNC machine | Exterior | | Curtain wall | | TEKLA | P10 | BEAT360 (Seoul/Korea) | 1,880 | | Al. panel Wood panel | 7,553 EA; 8,800 EA | CNC machine | Interior/exterior | | Interior/exterior finish | | | P11 | Denver Art Museum (Denver/USA) | 13,564 | 16,538 | Titanium panel | 9,000 EA | CNC machine | Exterior | 2,100 mm × 800 mm | Exterior finish | 39 months | CATIA, TEKLA | P12 | Water Cube (Beijing/China) | 90,000 | 52,000 | ETFE | 4,000 EA | CNC machine and pressure | Exterior | Diameter-7,500 mm Circle | Steel exterior finish | 50 months | Rhino, 3D MAX, Microstation | P13 | Bird’s Nest (Beijing/China) | 260,000 | 38,500 53,000 | ETFE PTFE | 884 EA 1,044 EA | CNC machine and pressure | Exterior | | Steel exterior finish | 46 months | TEKLA | P14 | Basra Sports City (Basra/Iraq) | | 65,000 | GFRP | 560 EA | Mold | Exterior | Length: 300,000 mm | Exterior finish | 53 months | CATIA, TEKLA | P15 | Louis Vuitton Foundation (Paris/France) | 11,000 | 13,500 9,000 | Concrete Glass | 19,000 EA 3,600 EA | CNC machine and MSV | Exterior | 3,000 mm × 1,500 mm 1,500 mm × 400 mm | Exterior finish | 74 months | CATIA | P16 | Louisiana State Museum and Sports Hall of fame (Natchitoches/USA) | 28,000 | 1,380 | Cast Stone panel | 1,150 EA | CNC machine | Interior/exterior | 2,000 mm × 500 mm | Interior/exterior finish | | Navisworks | P17 | Hangzhou Sports Park Stadium (Hangzhou/China) | 400,000 | 15,000 | AL. Panel | 55 EA | CNC machine | Exterior | Height: 12 m–18 m | Exterior finish | 84 months | Grasshopper | P18 | Perot Museum of Nature and Science (Dallas/USA) | 180,000 | 9,300 | Concrete steel | 700 EA 8,400 EA | CNC machine and mold | Exterior | 9,200 mm × 2,400 mm | Exterior finish | 31 months | REVIT | P19 | Phoenix Biomedical Campus: Health Sciences Education Building (Phoenix/USA) | 24,898 | 8,910 | Copper panel | 6,000 EA | Press brake-punch-and-die machine | Exterior | 3,300 mm × 300/450/760 mm | Exterior finish | 27 months | REVIT | P20 | Zlote Tarasy (Warszawa/Poland) | 205,000 | 10,240 | Glass Steel | 4,788 EA 7,123 EA | CNC machine | Exterior | 2.14㎡ per panel | Exterior finish | 52 months | | P21 | Weltstadthaus (Cologne/Germany) | 14,400 | 4,900 | Glass | 6,800 EA | CNC machine | Exterior | 0.72㎡ per a panel | Exterior finish | 72 months | | P22 | BMW Welt (Munich/Germany) | 16,500 | 8,000 | Glass | 4,500 EA | CNC machine | Interior/exterior | 2.22㎡ per a module | Interior/exterior finish | 56 months | Nemetschek Allplan | P23 | Museo Soumaya (Mexico City/Mexico) | 16,000 | | Steel | 16,000 EA | CNC machine | Exterior | 630 mm hexagon | Exterior finish | 38 months | CATIA | P24 | O-14 tower (Dubai/UAE) | 28,000 | | Concrete | | CNC machine and mold | Exterior | | Exterior finish | 48 months | Rhino, SAP2000 | P25 | Qatar National Museum (Doha/Qatar) | 47,000 | 120,000 | GFRC | 75,000 EA | Mold | Exterior | 400 m × 250 m per disc | Exterior finish | 72 months | CATIA | P26 | University of technology Sydney (Sydney/Australia) | 16,030 | 5,594 | Customized brick | 320,000 EA | Mold | Exterior | Brick: 76 mm × 110 mm × 230 mm | Exterior finish | 24 months | REVIT | P27 | Benz Museum (Stuttgart/Germany) | 16,500 | 6,171 5,289 | Glass AL. Panel | 1,800 EA 1,000 EA | Mold | Exterior | | Exterior finish | 36 months | |
|
|