Research Article

An Effective Approach to Input Variable Selection for Preliminary Cost Estimation of Construction Projects

Table 6

The weight of input variables with respect to the variable group (V3).

Input variable (VIJ)Fuzzy weightCrisp weight (BNP)

Inflation rate
Site topography
Soil type