Research Article
Influences of Urban Viaduct Pier Caps on Uneven Settlement of Roadbed
Figure 8
Longitudinal section of roadbed settlement for different buried depths of cap. (a) H = 0.2 m. (b) H = 0.85 m. (c) H = 1.35 m. (d) H = 1.85 m. (e) H = 2.35 m. (f) H = 2.85 m.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |