Influences of Urban Viaduct Pier Caps on Uneven Settlement of Roadbed
Table 5
Longitudinal roadbed settlement for different buried depths of cap.
| Buried depth H (m) | 0.2 | 0.85 | 1.35 | 1.85 | 2.35 | 2.85 | Level of settlement at point C (mm) | 7.4 | 8.4 | 9.8 | 16.9 | 39.5 | 39.3 | Level of settlement at point D (mm) | 55.9 | 57.6 | 55.1 | 55.1 | 73.3 | 72.5 | Settlement fall between point C and D (mm) | 48.5 | 49.2 | 45.3 | 38.2 | 33.8 | 33.2 |
|
|