Research Article

An Automated Procedure for Assessing Local Reliability Index and Life-Cycle Cost of Alternative Girder Bridge Design Solutions

Table 3

Initial costs of the two design alternatives for the girders.

Cost itemCost in alternative 1 ()Cost in alternative 2 ()

Construction4.673.6603.331.431
Safety burdens349.548337.046
Terrain purchase83.18283.182
Testing140.20999.942
Design327.156233.200
Total initial cost5.573.7554.084.801