Research Article
Study on the Evaluation Method of Green Construction Based on Ontology and BIM
| Number | Specific indicator content | Indicator values |
| 1 | Dust control: visual inspection of the fugitive dust height in the earthwork area (m) | 1.5 | 2 | Ambient noise at daytime (dB) | 65 | 3 | Suspended solid content in sewage water (mg/L) | 300 | 4 | Difference between monthly average total suspend particulate (TSP) on site and the city back ground value (mg/m3) | 0.065 | 5 | Recycle and recovery ratio of construction wastes (%) | 15 | 6 | Reuse ratio of field temporary housing and retaining wall material (%) | 40 | 7 | Reuse ratio of unconventional water and recycled water (%) | 45 | 8 | Illumination should not exceed the percentage of the minimum illumination (%) | 20 | 9 | Equip ratio of water-saving devices in administrative area and living quarters on site (%) | 80 | 10 | Ratio of energy-saving lightings (%) | 95 | 11 | Ratio of reusable partition walls (%) | 60 | 12 | Ratio of prefabricated parts (%) | 35 | 13 | Ratio of premixed mortar to building mortar (%) | 65 | 14 | Ratio of ordinary rebar with higher grades than 400 MPa (%) | 45 | 15 | Lost rate of reinforcement field processing (%) | 3 | 16 | Usage of tool type combination formwork (%) | 80 |
|
|