Research Article
A Simplified Calculation Method of Length Adjustment of Datum Strand for the Main Cable with Small Sag
Table 4
The target geometry parameters of the datum strand and catwalk bearing rope under erection stage.
| Item | Target unstressed length (m) | Position | Mileage (m) | Elevation (m) | l (m) | h (m) | f (m) |
| Catwalk bearing rope at main span | 863.989 | Anchorage point at Zhangjiajie side | 2545.782 | 592.072 | | | | Middle span | 2970.000 | 522.551 | 848.406 | 7.601 | 73.322 | Anchorage point at Huayuan side | 3394.188 | 599.673 | | | |
| Catwalk bearing rope at side span | 213.937 | Anchorage point at girder end | 2347.093 | 494.047 | | | | Middle point at side span in Zhangjiajie | 2442.523 | 541.093 | 190.859 | 97.991 | 1.950 | Anchorage point at tower end | 2537.952 | 592.038 | | | |
| Datum strand at main span | 869.797 | Tangent point at tower end in Zhangjiajie | 2543.967 | 593.374 | | | | Middle span | 2969.920 | 520.267 | 851.937 | 7.614 | 76.914 | Tangent point at tower end in Huayuan | 3395.904 | 600.988 | | | |
| Datum strand at side span | 218.338 | Tangent point at girder end | 2343.368 | 493.770 | | | | Middle span | 2440.621 | 538.664 | 194.505 | 98.986 | 4.599 | Tangent point at tower internal end | 2537.873 | 592.755 | | | |
|
|