A Simplified Calculation Method of Length Adjustment of Datum Strand for the Main Cable with Small Sag

Table 4

The target geometry parameters of the datum strand and catwalk bearing rope under erection stage.

ItemTarget unstressed length (m)PositionMileage (m)Elevation (m)l (m)h (m)f (m)

Catwalk bearing rope at main span863.989Anchorage point at Zhangjiajie side2545.782592.072
Middle span2970.000522.551848.4067.60173.322
Anchorage point at Huayuan side3394.188599.673

Catwalk bearing rope at side span213.937Anchorage point at girder end2347.093494.047
Middle point at side span in Zhangjiajie2442.523541.093190.85997.9911.950
Anchorage point at tower end2537.952592.038

Datum strand at main span869.797Tangent point at tower end in Zhangjiajie2543.967593.374
Middle span2969.920520.267851.9377.61476.914
Tangent point at tower end in Huayuan3395.904600.988

Datum strand at side span218.338Tangent point at girder end2343.368493.770
Middle span2440.621538.664194.50598.9864.599
Tangent point at tower internal end2537.873592.755