Comparing Project-Based Collaborative Networks for BIM Implementation in Public and Private Sectors: A Longitudinal Study in Hong Kong

Table 6

Core-periphery structure in PRCN.

Time pointsDensity of linkagesNumber of nodes in the coreFinal fitness
CorePeriphery

2009
 Core0.2480.005150.376
 Periphery0.0050.003
2011
 Core0.6670.0470.373
 Periphery0.040.008
2013
 Core0.4240.036120.336
 Periphery0.0360.012
2015
 Core0.2810.043200.291
 Periphery0.0430.017
2017
 Core0.2250.047260.294
 Periphery0.0470.018