Advances in Civil Engineering / 2019 / Article / Tab 3

Research Article

Calculation Methods for the Permeability Coefficient of Concrete Face Rockfill Dam with Cracks

Table 3

Level of each factor.

iPermeability coefficient (m/s)
Concrete slabCushionTransition layerMajor rockfill

11 × 10−111 × 10−61 × 10−40.0001
26 × 10−113.5 × 10−63.5 × 10−40.0005
31 × 10−106 × 10−66 × 10−40.001
45.5 × 10−98.5 × 10−68.5 × 10−40.005
51 × 10−91 × 10−51 × 10−30.01

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.