Research Article

Calculation Methods for the Permeability Coefficient of Concrete Face Rockfill Dam with Cracks

Table 5

Inversion results of the permeability coefficient (m/s).

Concrete slabCushionTransition layerMajor rockfill

2.52 × 10−105.11 × 10−65.57 × 10−44.34 × 10−2