Research Article
Image-Based Underwater Inspection System for Abrasion of Stilling Basin Slabs of Dam
Figure 5
Schematic diagrams of the operation of the integrated component: (a) siltation initial state; (b) siltation-removing state; (c) siltation-suspending state; (d) siltation recovered state.
(a) |
(b) |
(c) |
(d) |