Research Article
Image-Based Underwater Inspection System for Abrasion of Stilling Basin Slabs of Dam
Figure 6
Schematic diagrams of the operation of the integrated component without transparency: (a) siltation initial state; (b) siltation-removing state; (c) siltation-suspending state; and (d) siltation re-covered state.
(a) |
(b) |
(c) |
(d) |