Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects

Table 7

Results of the FMCDM model (case two).

ā€‰WeightsAlt. 1Alt. 2Alt. 3Alt. 4Alt. 5Alt. 6Alt. 7Alt. 8Alt. 9Alt. 10

Time0.8190.2900.2420.1480.1070.0700.0470.0380.0280.0170.013
Cost0.0910.0130.0160.0270.0370.0580.0840.1050.1440.2310.286
Risk0.0910.0130.0160.0270.0370.0580.0840.1050.1440.2310.286
Total scores0.2400.2010.1260.0940.0680.0540.0500.0490.0550.063

The bold values represent the total weight score for each alternative.