Research Article

Site Measurement and Study of Vertical Freezing Wall Temperatures of a Large-Diameter Shield Tunnel

Table 3

Construction parameters for triple-shaft mixing pile.

NameTechnical parameterNameTechnical parameter

Rate of sinking (m/min)0.4∼1.0Cement gradingP.O 42.5 R
Uplift velocity (m/min)0.4∼1.0Cement contentStrongly reinforced region 20%, weekly reinforced region 10%
Grouting pressure (MPa)1∼2Grout coordinate ratioWater: Cement = 1.5 : 1