Research Article
Shield Equipment Optimization and Construction Control Technology in Water-Rich and Sandy Cobble Stratum: A Case Study of the First Yellow River Metro Tunnel Undercrossing
Figure 12
Schematic diagram of the improved device for slurry transfer hose.