Optimization Method of Reducing the Differential Settlements of Piled Raft Foundations Based on Pile-to-Pile Interaction Theory
Table 6
Pile length corresponding to different pile numbers in Figure
9
(Case 1).
Pile-Case 1
1
2
3
4
5
6
Others
Pile length (O-U)
33.5 m
34 m
35 m
35.5 m
36 m
36.5 m
37 m
Pile length (O-N)
31.5 m
34 m
35 m
34.5 m
36 m
—
37 m