Research Article

Optimization Method of Reducing the Differential Settlements of Piled Raft Foundations Based on Pile-to-Pile Interaction Theory

Table 6

Pile length corresponding to different pile numbers in Figure 9 (Case 1).

Pile-Case 1123456Others

Pile length (O-U)33.5 m34 m35 m35.5 m36 m36.5 m37 m
Pile length (O-N)31.5 m34 m35 m34.5 m36 m37 m