Soil parameters of the construction site.

Layer indexGeologic originClassificationBuried depth (m)Density, ρ(g/cm3)Permeability, vertical, (cm/s)Permeability, horizontal, KH (cm/s)Compression modulus, Es0.1-0.2 (MPa)Cohesion, c (kPa) (CU test)Friction angle, φ (°) (CU test)Basic bearing capacity, fak (kPa)

11Q43Miscellaneous fill1.2–6.2
11-2Q43Plain fill0
21Q43Silty clay0.5–3.01.798.9E − 071.33E − 064.561816.570
3Q42Soft silty clay5.1–9.31.692.22E − 073.2E − 073.171313.550
41Q42Silty clay11.4–17.41.661.95E − 072.75E − 072.071311.550
51Q41Clay14.5–25.41.752.62E − 071.9E − 073.021417.570
51-1Q41Sandy silt18.3–21.51.752.62E − 071.9E − 079.61431120
51-2Q41Silty clay20.9–25.51.781.63E − 062.39E − 063.37151680
52Q41Silty sand17.1–21.81.811.13E − 051.76E − 058.89033.5130
53-1Q41Silty clay26–29.81.791.7E − 062.72E − 064.352119100
6Q32Clay19.2–30.91.922.88E − 074.32E − 076.824516.5130
71Q32Sandy silt26.7–34.91.903.2E − 044.37E − 0411.411031.3150