Research Article

Shield Tunneling under Railway Station Throats in Soft Soil Areas: A Case Study

Table 2

Comparison of the proposed route schemes.

Parameter(East) Liuzhou Road scheme(West) Guilin Road scheme

Length (km)3.462.91
Line shapePoor, 2 curves with R = 350 mGood, regular curve with R < 450 m
Interchange transferabilityGoodPoor
Passenger appealGoodPoor
Impact of construction on road trafficAcceptableExtensive
Railway to be crossedEast throat of the Shanghai South StationWest throat of the Shanghai South Station
Buildings to be crossed40
Other underground structures to be crossedLiuzhou Road InterchangeGuilin Road Interchange, tunnel section of the Metro Line 1 and its diaphragm wall
Engineering riskHighMedium