Research Article

A Cost-Benefit Methodology for Selecting Analytical Reinforced Concrete Corrosion Onset Models

Table 12

Building archives of the 2 considered structures A and B.

DataComplete building archive (A)Slight building archive (B)

Structure
Date of constructionGivenGiven
Architectural planAvailableAvailable
Reinforcement planAvailableAvailable
Design calculations and reportAvailableMissing

Concrete
Concrete type (regular concrete, high performance, etc.)GivenGiven
Aggregate contentsGivenMissing
Cement contentGivenMissing
GivenMissing
Cure duration ()GivenMissing
Given within compliance test reportGiven

Cement
TypeGivenMissing
CompositionDetailed (technical datasheet)Missing