Research Article

Numerical and Theoretical Study on the Settlement of Capped Piles Composite Foundation under Embankment

Table 4

Settlement comparison of calculated and observed results.

Calculation methodThis methodEs method [21]Ep method [22]Settlement-reducing piles method [27]Observed data

Settlement (mm)86.0181.373.8137.898.7 (P1)
94.1 (P2)

Error (%)10.888.123.442.9ā€”