Research Article

Reaction Spectrum Comparative Analysis of Seismic Performance of 62 m CFST Bridge with Curved-String Truss before and after Reinforcement

Table 10

Comparison of peak values of displacement at the mid-span position of bridge decks before and after reinforcement.

Bridge statusWorking conditionsUX (mm)UY (mm)UZ (mm)

Before reinforcement10.6110.2475.825
20.3200.7106.389
30.7230.28516.397

After reinforcement10.4600.1812.265
20.2530.5422.007
30.5230.1963.946