Research Article
Temperature Gradient and Its Effect on Long-Span Prestressed Concrete Box Girder Bridge
Figure 15
The predicted vertical temperature distributions along the depth of the girder at the six cross-sections on August 3, 2010, when the vertical temperature differences reached a maximum value.