Research Article

Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv

Figure 10

Portal sealing: (a) installation of the sealing steel ring and (b) foam sealant between the steel sealing ring and the underground diaphragm wall.
(a)
(b)