Research Article
Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
Figure 10
Portal sealing: (a) installation of the sealing steel ring and (b) foam sealant between the steel sealing ring and the underground diaphragm wall.
(a) |
(b) |