Research Article

Seismic Performance Assessment of Reinforced Concrete Frame-Shear Wall Structures in Hydropower Plants Based on Material Damage

Table 2

Relationship between damage states, engineering limit states, and material damage.

Damage stateEngineering limit state

NegligibleConcrete cover cracking onset0.1≈0≈0
LightConcrete cover spalling onset0.1
Plastic hinge initiating1
ModerateConcrete cover important spalling0.5
Concrete core crushing onset0.1
Reinforcement yielding
SevereConcrete cover severe spalling0.8
Concrete core important crushing0.5

Note. is the yield strength of reinforcement.