Research Article
Cost and CO2 Emission Reduction Effects of a Partially Encased Composite Precast Concrete Beam
| Item | Unit | RCB1 | RCB2 |
| Screwed rebar | Slab rebar | kg | 5.65 | ā | Stirrup | kg | 11.38 | 15.19 | Longitudinal rebar | kg | 38.53 | 38.53 | Constructional rebar | kg | 3.55 | 10.81 | Concrete | m3 | 0.23 | 0.25 |
|
|