Advances in Civil Engineering / 2020 / Article / Fig 2

Research Article

Assessment of the Excavation Damaged Zones in the Surrounding Rock of an Underground Powerhouse under High In Situ Stress Using an Acoustic Velocity Detecting Method

Figure 2

Layout of the underground cavern group at the Houziyan hydropower station.

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.