Research Article

A Closed-Form Solution for the Analysis of Antifreeze Disease Fortification Length in a Permafrost Tunnel

Figure 10

Cross-sectional geometry of the Fenghuo Tunnel: (a) cross-sectional structure of the schedule drawing; (b) practical engineering of the Fenghuo Tunnel.
(a)
(b)