Research Article

Numerical Study on the Disturbance Effect of Short-Distance Parallel Shield Tunnelling Undercrossing Existing Tunnels

Table 3

The comparative analysis results of the maximum settlement and error of the vault.

Monitoring point numberAfter excavation of right line of line 5 (numerical results)After excavation of right line of line 5 (actual value)Error value (%)After excavation of left line of line 5 (numerical results)After excavation of left line of line 5 (actual value)Error value (%)

ZGD-1−2.22−2.355.53−5.32−5.615.17
ZGD-2−2.17−2.295.24−5.24−5.545.42
ZGD-3−2.11−2.224.95−5.14−5.435.34
ZGD-4−2.10−2.235.83−5.12−5.405.19
ZGD-5−2.08−2.163.70−5.12−5.364.48
ZGD-6−2.03−2.124.25−5.07−5.304.34
ZGD-7−1.93−2.045.39−4.94−5.215.18
ZGD-8−1.90−1.994.52−4.9−5.175.22
ZGD-9−1.82−1.956.67−4.86−5.145.45