Research Article

Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess

Figure 15

The vertical displacement curves of monitoring points (a) R30-LL-4 and (b) R30-RR-10 during construction.
(a)
(b)