Advances in Civil Engineering / 2020 / Article / Tab 5

Research Article

Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess

Table 5

Parameters of structures of the utility tunnel.

Subject (kN/m3) (MPa)

Soil-nailed wall222.18E + 040.2
Soil nailing78.52.00E + 050.3
Cushion232.60E + 040.2
Corridor253.15E + 040.2

We are committed to sharing findings related to COVID-19 as quickly as possible. We will be providing unlimited waivers of publication charges for accepted research articles as well as case reports and case series related to COVID-19. Review articles are excluded from this waiver policy. Sign up here as a reviewer to help fast-track new submissions.