Research Article

Application of the Upper-Bench CD Method in Super Large-Span and Shallow Tunnel: A Case Study of Letuan Tunnel

Table 5

Maximum internal force of initial support.

Construction methodAxial forceBending moment
Maximum (kN)PositionMaximum (kN·m)Position

Upper-bench CD method2000Right side of vault105Right arch foot
CD method2180Right arch waist162Right foot
CRD method1970Left arch foot69Left foot
Both-side drift method1700Right arch waist143Left foot
Field test1967Left arch foot11.7Left foot