Research Article

Analysis on Deformation and Stress Characteristics of a Multibraced Pit-in-Pit Excavation in a Subway Transfer Station

Table 5

The parameters of the pile and the wall.

Type of pilePile diameter (mm)Spacing of the center of the pile (mm)Converted wall thickness (mm)Type of wall

A8001000623A′
B8001100603B′
C8001200586C′
D12001600914D′
E12001650905E′
F12001500934F′