Research Article
An Investigation into the Tunnel-Soil-Pipeline Interaction by In Situ Measured Settlements of the Pipelines
Figure 1
Layout of Huangzhuang station and the ground profile: (a) plane view; (b) section A-A; (c) section B-B; (d) section C-C.
(a) |
(b) |
(c) |
(d) |