Research Article

An Investigation into the Tunnel-Soil-Pipeline Interaction by In Situ Measured Settlements of the Pipelines

Figure 1

Layout of Huangzhuang station and the ground profile: (a) plane view; (b) section A-A; (c) section B-B; (d) section C-C.
(a)
(b)
(c)
(d)