Research Article

An Investigation into the Tunnel-Soil-Pipeline Interaction by In Situ Measured Settlements of the Pipelines

Figure 2

Main construction steps of the PBA method: (a) step 1; (b) step 2; (c) step 3; (d) step 4; (e) step 5; (f) step 6.
(a)
(b)
(c)
(d)
(e)
(f)