Research Article
An Investigation into the Tunnel-Soil-Pipeline Interaction by In Situ Measured Settlements of the Pipelines
Figure 2
Main construction steps of the PBA method: (a) step 1; (b) step 2; (c) step 3; (d) step 4; (e) step 5; (f) step 6.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |