Research Article
Experimental Study of the Influence of Excavation Surface Stability and Sand Flowability Caused by Dense Slurry–Earth Pressure Balance Shield Tunneling in Silty Sand Stratum
Figure 14
Pore pressure change with distance during shield tunneling.