Advances in Civil Engineering / 2020 / Article / Fig 2

Research Article

Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure

Figure 2

Schematic profile of the transition zone. (a) Longitudinal profile of the transition zone. (b) Detailed components of the pile-plank structure.
(a)
(b)

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.