Material properties of the components in the transition zone [15, 22, 33].

Components or materialYoung’s modulus E (MPa)Poisson’s ratio μDensity ρ (kg/m3)Rayleigh damping
α (s−1)β (s)

Rail205,9000.307,8300.0220.002
Track slab32,5000.162,5000.0980.009
Base slab25,5000.162,5000.0980.009
Graded gravel + 5% cement1,7800.302,1000.2290.021
Graded gravel1,5800.242,0000.2520.022
Bearing plank56,0000.202,5000.0850.009
Cast-in-situ bores pile38,0000.202,5000.0980.008
Silty clay150.301,9300.2620.024
Sand layer750.301,9500.2700.023
Limestone6000.292,0900.2350.02
Abutment30,0000.202,3000.0980.009
Bridge deck22,0000.182,5500.0980.009
Tunnel filled concrete20,0000.202,4000.0980.009