Main parameters of the phased development scheme of Rogun HPP.

ParametersPhase 1Phase 2Phase 3

Height (m)225285335
Normal reservoir level (m)118012401290
Minimum operating level (m)112011801230
Initial capacity (km3)2.786.7613.3

Initial effective capacity (km3)1.923.9810.3
Total installed (MW)120024003600

Installed unit number (pcs)346
Annual generating capacity (TWh)6.711.614.5