Research Article

Deformation Response and Safety Evaluation of Buildings Affected by Subway-Station Construction

Figure 15

Floor settlement of the three buildings when the longitudinal wall of the building is perpendicular to the foundation pit. (a) Building A. (b) Building B. (c) Building C.
(a)
(b)
(c)