Research Article

Prediction-Based Maintenance of Existing Bridges Using Neural Network and Sensitivity Analysis

Table 5

Information of bridges A and B.

Bridge ABridge B

Elevation (m)32.9
Bridge length (m)3512.54
Bridge width (m)9.511
Years in service (years)1250
Carbon dioxide (ppm)393.32356.38
Chloride (kg/m3)2.22
Large-size vehicles rate (%/day)15.320.3
Traffic volume (vehicles/day)105713233
Rainfall (cm)9541060
Snowfall (cm)345.77635.60
Highest temperature (°C)1924
Lowest temperature (°C)−3−3